STEP-BY-STEP ASSEMBLY
TANKS FROM 1 TO
10,000M3 (260 – 2,500,000 USG)
Despite its’ great strength, GRP is
lightweight – just 1/3 one third the
weight of an equivalent steel panel.
All panels can be lifted by hand, with
no special equipment required even where
access is difficult, and installation
can progress quickly and efficiently.
Step 1. Install steel
footings on leveled concrete
foundations.
Step 2. Align GRP panels to be
pre-assembled.
Step 3. Place rubber sealant from
ready-to-use roll between panels..
Step 4. Connect panels with bolts and
nuts.
Step 5. Position bottom panel sections,
and finish up base of tank.
Step 6. Position three sides of the
tank.
Step 7. Position and fix roof panels and
if required, roof support pipes and
plates.
Step 8. Install reinforcement if
required.
Step 9. Close up the tank with the
fourth side.
Step 10. Finish the internal or external
reinforcement.
Step 11. Fill and test.